Client: Sellen Construction

City: Downtown Bellevue

Size: $4.9 Million

 

Working with Sellen Construction, NWC completed this classic conveyor excavation project in downtown Bellevue. Starting with site demolition and temporary erosion control, the crews moved on to mass excavation, shoring excavation and support, structural excavation and backfill.  The utilities work included a modular storm water bio-filtration system installation, an irrigation sleeve repair, as well as standard domestic water, fire water, sanitary sewer and storm sewer utilities.