YMCA

Newcastle and SeaTac, WA

NWC was involved in the construction of two YMCA facilities and performed similar activities at each site: clearing and grubbing; site excavation; grading; aggregate placement; and utility installation, including off- and on-site water and sewer and an on-site storm system with a detention pond.

The Newcastle site presented unusual challenges, as it was built on coal tailings from the old Coal Creek Mine. A custom pile system, known as “heat anchors,” had to be used for the buildings. The anchors used 6-foot well casings as piling, augured into the ground at an average of 340 feet in length at 30 feet deep.