LOCATION
Puyallup, Washington
DESCRIPTION
Our team was contracted to install the off-site utilities for the Viking Distribution Center, located next to the Puyallup River.
SCOPE OF WORK
We are responsible for the clearing, grubbing, and off-site utility installation (water, storm, and sewer) including the installation of an outfall for the 42” storm that was lined with an Armorflex mat.
PROJECT HIGHLIGHTS
- Installation of approximately 2900 linear feet of a 42” storm conveyance line ranging from 18’ to 24’ deep
- Installation of roughly 3500 linear feet of 10”, 12”, 18”, 24” & 36” storm
- Installation of roughly 3700 linear feet of 12” & 16” water
- Installation of roughly 2000 linear feet of 10” sewer