LOCATION
Puyallup, Washington
DESCRIPTION
Our team was contracted to install the offsite utilities for the Viking Distribution Center, located next to the Puyallup River.
SCOPE OF WORK
We are responsible for the clearing, grubbing, and offsite utility installation (water, storm, and sewer) including the installation of an outfall for the 42” storm that was lined with an Armorflex mat.
PROJECT HIGHLIGHTS
- Installation of approximately 2900 linear feet of a 42” storm conveyance line ranging from 18’ to 24’ deep
- Installation of roughly 3500 linear feet of 10”, 12”, 18”, 24” & 36” storm
- Installation of roughly 3700 linear feet of 12” & 16” water
- Installation of roughly 2000 linear feet of 10” sewer